Friday, August 20, 2021

Cracks at KPSL

 As noted in previous post, the crack between Sections 2 & 3 of the Knowledge Park Shortline needs a little attention.  Made some effort today with poster board, spackling, paint, ground foam, and a few ties.  Could not get the diluted white glue bottle open so painted on some super strength hair "spray" and used a plastic spoon to distribute some "grass".  May want to come back with diluted white glue at some point and also need to insert the warehouse spur rails into the connectors.  But the layout was left with all trains running!

Before (but with wet white glue on fence)

During (with poster board being installe)

After



In action


No comments:

Post a Comment