KP, as Knowledge Park in Rock Hill is known, should have a display case for the first two phases of the N scale train layout by mid-January, 2021. Phase III is currently under construction, so some sort of signage is needed to communicate the status. How's this?!
Thursday, December 24, 2020
Saturday, November 21, 2020
Let's Join Knowledge Park
Seems this blog has been hijacked by the Knowledge Park project! Oh well, railroads is railroads.
With the desire from the "owner" to combine the original 1953 era downtown Rock Hill (Phase I) with the extension down White Street (Phase II), a little adjustments needed to be made. First, I and II were bolted together with the two tracks along what is now Village Way lined up pretty closely:
White Street (not shown) will need to be adjusted about 1/4 inch or so.
The trestle at the joint needs to be covered/converted to an extension of the bank for the higher track and the two Chatham Avenues need to be somehow combined:
A display case will surround the layout so the wiring for Phase II and III needs to go BEHIND the control box, like this:
And the light switches need to be placed under the layout:
Friday, October 9, 2020
Knowledge Park Phase II Gets Legs
Here is Phase II on legs. Used roughly the same approach as for the downtown area -- this time 1X4's instead of 2X4's for legs plus lauan gussets and 1X2" angle "stretchers".
Thursday, September 3, 2020
Knowledge Park and Rock Hill Phase II
Jim continues to work on one of two additions to the 1953 model of Rock Hill, SC. The focus is the "textile corridor" near downtown Rock Hill now being developed as "Knowledge Park".
The original section is downtown just up to what is now Dave Lyle, or just a bit to the northwest, thereof. The second section will extend from current Dave Lyle to about halfway to Stewart Ave, and bounded by White Street on the southwest and the railroad tracks on the northeast.
Views from northwest, looking southeast with and without lights
Remarkable work!
Builder needs to add some finishing touches and then get it out of the way to build Phase III. These two phases are about 9X5', each.
Oh, and a movie of the switcher running between sense switches with a pause built in at
both ends.
Thursday, July 16, 2020
Let there be LIGHT
Actually, the lighting is a good bit better and without noticeable shadows. This is about 16 feed of rope light from Walmart installed with one "factory" clip and several zipties.
BIL did say that he thought of a Christmas tree?!?!
Wednesday, July 15, 2020
18, Count 'Em
Monday, July 13, 2020
Back from the Edge
So, with a little effort, a roughly 6-inch by 12-inch rectangle was cut out with top corners rounded off. As close as the rail is to the edge, there may not be room for the little bit of overhang that might be needed if the hardboard is mounted directly to the sides of the layout table. Maybe a couple of lengths of 1/2 inch "trim" could offset it enough.
Some olive and leather spray paint was supposed to help the guardrail blend in; maybe it did.
BIL checked out the left side and mentioned it was pretty close, too. Just happened to have some hardboard on the table saw and before you knew it, another but somewhat smaller guardrail was in place.

